Projects

A selection of landmark projects delivered by Ruben Rodriguez and the Consultivo team.

NLand Surf Park Austin Texas — inland surf lagoon

NLand Surf Park — Austin, TX

NLand Surf Park is an inland surfing destination near Austin, Texas, located ten minutes from Austin-Bergstrom International Airport at 4836 East Highway 71, Del Valle, Texas 78617. The park offers surfing sessions, lessons, clinics, or group surfing for first-time, beginner, intermediate, and advanced surfers. In addition to the 14-acre surf lagoon and surrounding land, the park includes a surf shop and a restaurant (Blue Prairie), and a craft brewery (NLand Brewing Company).

NLand's surf lagoon is the largest man-made surf lagoon in North America. Founder Doug Coors partnered with Spanish engineering firm Wavegarden to design and build the lagoon, which offers six-foot-high waves as well as gentler waves for surfing and bodyboarding. NLand's waves provide rides of up to 35 seconds and surfers have the opportunity to catch a new wave every two minutes.

On January 8, 2019, the World Surf League purchased NLand.

Ruben Rodriguez and his team provided Owners Representative services to this project (with RLB).

The Dorchester Hotel Park Lane London — five star renovation

The Dorchester Hotel — Park Lane, London

The famous five star Dorchester hotel in Park Lane. A major renovation was carried out while the hotel remained in operation. Ruben Rodriguez and team acted as Project Managers for this amazing project.

At the time this construction work, being done in multiple phases behind perfectly decorated temporary walls and screens, was an innovative approach to not upsetting the customer experience. John Wayne, standing in that very bar wondered out loud if the room was getting smaller, and of course he was right.

Grand Hyatt San Antonio Convention Headquarters Hotel aerial view

Grand Hyatt San Antonio Convention Headquarters Hotel — San Antonio, TX

Grand Hyatt San Antonio Convention Headquarters Hotel. With five levels of below grade parking and 1,004 guest rooms over 27 floors topped with six levels of high end condos, this project is an outstanding edifice to the San Antonio vibrant entertainment and convention district. 100,000 gross square feet of meeting space complements the convention center.

Ruben Rodriguez and team delivered this project, with some difficulty — but we never gave up and got there.

$145m Design-Build project.

Indicative Project Experience

Selected projects include landmark commercial, hospitality, institutional, and financial developments across Texas, the UK, Europe, and Asia.

  • Grand Hyatt San Antonio, TX — Convention H.Q. hotel and expansion, $145m, 1,000 guest room hotel including 80 condos in a 1,000,000 gsf development comprising 5 levels of below grade parking and extensive meeting facilities. Design-Build project.
  • Jack S. Blanton Museum of Fine Art (Phase 1) — Austin, TX, $50m, 105,000 gsf museum on the University of Texas campus, directly across from the State Capitol Building. CMAR project.
  • Hilton Convention HQ Hotel Development — Austin, TX, $177m, 31-story, four-star convention center headquarters hotel with residential and retail components in downtown development. Design-Build project.
  • South Side on Lamar Loft Conversion — Dallas, TX, $50m conversion and renovation of the historic Sears catalogue warehouse into 456 loft-style apartments, including rooftop swimming pool, retail and commercial areas. CMAR project.
  • AMD Micro-Chip Fabrication — Austin, TX. Client representative dealing with cleanroom construction protocol and procedures.
  • Wet Pharmaceutical Lab and Cleanroom Expansion — Waco, TX, $6.5m addition of 100 Class 2 clean rooms, approximately 32,000 gsf. Design-Bid-Build project.
  • Sports Stadium Complex — Waco, TX, $13m, 10,000-seat football stadium for Waco I.S.D., fast-track showcase project with six-story press box, offices, four concession stands, and softball and baseball complexes.
  • Commercial Class A Office — Mexico City, Mexico, $139m, 55-story office development with four basement levels in downtown financial district. Owner's Rep as Project Director.
  • City Center Development — London, UK, $222m. Owner's construction management representative for design reviews, feasibility studies, scheduling, constructability presentations, scope issues, and hazardous substance abatement.
  • Chase Manhattan Bank — Corporate Offices. Major refurbishment of 11-story twin towers, upgrading to a high standard of finishes and MEP services including new computer room, dealer's area, cafeteria, vault, UPS, executive offices, elevators and MIS/IT & BMS systems. Work carried out in 32 phased hand-over and decanting.
  • Bank of Scotland, Bank of Lavoro, Bank of America, Dai Ichikango Bank, Union Bank of Switzerland, Bank of Ireland, Bank of Nova Scotia, Midland Bank, Lloyds Bank, Stock Exchange — high-quality refurbishment and dealer's room provisions as Project Manager and Division Manager.
  • Piccadilly Theatre — Structural alterations and facilities upgrade to a historic downtown building. Complete finishes upgrade and installation of 90' oval remote-controlled movable acoustic ceiling.
  • Duke of York Theatre — Major structural alterations and upgrade including new back-of-house facilities and new recording studio. Removal of existing cast iron columns, high-quality finishes, and restoration of antique fixtures including fibrous plaster and gilt work.
  • Hilton Hotels Park Lane — Major remodeling of 22 floors of hotel suites, including new main foyer, restaurants and kitchen areas.
  • Dorchester Hotel — New restaurant, kitchen and bar areas, together with additional meeting room and conference facilities.
  • Grosvenor House Hotel — Renovation and upgrade of five-star hotel including new MEP, 11 elevators, three restaurants, 2 kitchens, foyer, suites, convention facilities, and structural alterations.
  • Securities Commission Headquarters — Kuala Lumpur, Malaysia. Construction of new 1,000,000 gsf office building and convention center, including lecture theatres, audio/visual rooms, and executive offices. Fast-track top-down method for five basements and 7 levels above.
  • No. 6 Lime Street — Historic City Offices, London. High-profile, structurally complex project including façade retention, complete demolition behind two buildings, new structural steel frame, and facilitation of Roman archaeological excavation.
  • St. Thomas Hospital — Upgrade of all services and logistics, including addition of new recovery wing, two floors. All work carried out during ongoing occupancy.